and the valley is drying up fairly well.

4. Tunnels:

built.

The Faces of No 1 Tunnel are being slowly

1

5.

efd

OLI J

dabw

0

5. Beacon Hill Tunnel: The average heading driven per

week is just over the seventy feet calculated on. A very

bad in-rush of water was encountered at the North Side which

at the first burst washed everything before it. The water

came out and is still coming with great violence as if under

a good head of pressure. Its volume would about fill an

eight inch diameter pipe at its worst. This impeded progress very much at the North Side until the heading was driven well

past it. For some time the water lept following up the

heading.

At

6. The widening out does not show much progress. the North Side the delay was caused by having to enlarge the

heading round the bottom of the shaft. This necessitated

closing down some of the enlargement faces so as to decrease

the amount of excavated material to be disposed of. At the

South Side the three remaining English miners are not working

quite so well as they might. They have been working on piece

work for some time in order to avoid claims for over time.

Two of them are not in good health and their mode of living

is not such as would give them a chance of being able to

stand the coming summer. I am taking the matter up with the

Government with a view to sending them home as though they

do not do anything bad enough to merit actual dismissal with

forfeiture of passage money I do not think it will pay to keep

them any longer. I have a good supply of Italian miners now

who give far less trouble than the Englishmen and seem to stand

the climate much better.

7. The lining also has dragged behind a bit but I

think that this will get along better now that the bottom of

-15-

the